Home / Coverage

Delivery areas

Warehouse and industrial zones we deliver to across Indonesia

Fabrication runs from one plant in Bekasi. What changes by region is shipping and access — both are priced and scheduled openly, not discovered halfway through a project.

Greater Jakarta

The corridor where most document storage sits

Roughly two-thirds of Indonesia’s commercial record storage capacity sits within a two-hour drive of Jakarta. Delivery here is normally same-week once fabrication is complete.

AreaWarehouse and industrial zonesDelivery
North & East JakartaCakung–Cilincing, KBN Marunda, Pulogadung, Sunter, Tanjung PriokSame week
West Jakarta & TangerangDaan Mogot, Cengkareng, Batuceper, Cikupa, Balaraja, Jatake, Alam SuteraSame week
Bekasi & CikarangMM2100, Jababeka, EJIP, Delta Silicon, Lippo Cikarang, GIIC Deltamas, Marunda CentreSame week
Karawang & PurwakartaKIIC, Suryacipta, Mitra Karawang, Bukit Indah, Kota Bukit IndahSame week
Bogor & DepokSentul, Citeureup, Gunung Putri, Cibinong, SawanganSame week
Serang & CilegonModern Cikande, Krakatau Industrial Estate, Ciwandan, Bojonegara2–4 days

Java corridors

West, Central, and East Java

AreaWarehouse and industrial zonesDelivery
Bandung & West JavaRancaekek, Cimahi, Batujajar, Gedebage, Padalarang, Majalaya2–4 days
Cirebon & SubangCirebon port area, Palimanan, Patimban corridor, Kertajati2–4 days
Semarang & KendalTerboyo, Tanjung Emas, Wijayakusuma, Kawasan Industri Kendal, Ungaran, Demak3–6 days
Solo & Central JavaPalur, Sragen, Boyolali, Klaten, Kudus, Cilacap3–6 days
Surabaya & SidoarjoSIER Rungkut, Margomulyo, Tandes, Kalianak, Berbek, Waru, Krian4–7 days
Gresik & PasuruanJIIPE, Manyar, PIER Rembang, Ngoro Mojokerto, Bangil4–7 days
Malang & East JavaSingosari, Pandaan, Jember, Banyuwangi5–8 days

Outside Java

Sumatra, Kalimantan, Sulawesi, and eastern Indonesia

Shipping schedules rather than distance drive the timeline here. We confirm the sailing before committing an installation date, so crews are not sitting idle waiting for material.

RegionWarehouse and industrial zonesDelivery
North SumatraKIM Medan, Belawan, Tanjung Morawa, Mabar, Deli Serdang1–3 weeks
Riau & Riau IslandsBatamindo, Kabil, Muka Kuning, Sekupang, Pekanbaru, Dumai1–3 weeks
South Sumatra & LampungPalembang, Tanjung Api-Api, Panjang, Tanjung Bintang, Natar1–2 weeks
West Sumatra, Jambi, AcehTeluk Bayur, Padang, Jambi, Lhokseumawe, Arun2–3 weeks
East KalimantanKariangau Balikpapan, Samarinda, Bontang, Sangatta2–3 weeks
South & West KalimantanTrisakti Banjarmasin, Liang Anggang, Sungai Raya Pontianak2–3 weeks
South SulawesiKIMA Makassar, Soekarno–Hatta port area, Parepare1–3 weeks
Central & North SulawesiKEK Palu, Morowali IMIP, Kendari, Bitung, Manado2–4 weeks
Bali & Nusa TenggaraDenpasar, Sanur logistics area, Mataram, Kupang1–2 weeks
Maluku & PapuaAmbon, Weda IWIP, Sorong, Timika, Jayapura3–5 weeks

What actually changes by location

Fabrication does not

Everything is made in the same plant in Bekasi, to the same specification, whether the facility is in Cikarang or Sorong. Three to four weeks after drawings are approved, regardless of destination.

Shipping and access do

Outer-island projects are scheduled around sailings, and port handling adds time that has nothing to do with the racking itself. We confirm the vessel before committing an installation date rather than promising a date and explaining the delay afterwards.

Site conditions vary more than people expect

Access width, floor condition, and available lifting equipment differ enormously between a modern estate warehouse in Cikarang and a converted building in a regional city. That is why survey data matters more for remote projects, not less — a wrong assumption costs a return trip.

Bonded and special zones

Work inside bonded logistics centres, KEK zones, and the Batam free trade area follows each operator’s permit and access rules. These are built into the schedule from the start, since access approval frequently takes longer than the installation itself.

Coverage summary
Plant locationSummarecon Bekasi, West Java
Provinces served34
Projects delivered1,600+ since 2006
Fabrication time3–4 weeks, all destinations
Greater Jakarta deliverySame week
Java corridors2–8 days
Outer islands1–5 weeks by sailing schedule
Special zonesBonded, KEK, Batam FTZ

FAQ

Questions about coverage

Do you deliver outside Java?

Yes. Material is shipped and installation crews travel to site; projects have been completed in 34 provinces including Sumatra, Kalimantan, Sulawesi, and eastern Indonesia.

How does location affect lead time?

Fabrication time is the same wherever the facility is — three to four weeks. What changes is shipping: same week within Greater Jakarta, roughly one to two weeks to other Java corridors, and two to four weeks for outer islands depending on sailing schedules.

Is the site survey chargeable outside Greater Jakarta?

Travel is discussed beforehand for facilities further afield. In practice much of the work can start remotely from drawings, photographs, and box data, with a physical survey scheduled once the scope is broadly agreed.

Can you work inside bonded zones and free trade areas?

Yes. Work inside bonded logistics centres, KEK zones, and the Batam free trade area follows the operator’s own permit and access procedures, which we build into the installation schedule rather than treat as an afterthought.

Facility outside Greater Jakarta?

Send drawings and photographs — most of the study can start before anyone travels.